APE D62 diesel hammer to Turkmenistan

For the construction of Block 2 Riser Platform at Djeytun (LAM) Oil Fields at the Caspian Sea, APE Holland send a D62 diesel hammer with a flying leader for driving piles of 1067 mm.


Disclaimer | VisualMedia