First piles for the Helwin Base Frame project are succesfully installed with the APE Twin Kong.

First piles installed on Helwin

CAPE Holland is proud to announce it has been awarded for a purchase contract for an APE Model 600 Tandem vibratory hammer set (Tandem Super Kong). For the installation of the Helwin 1 and BorWin 2 base frames Seaway Heavy Lifting will use the Tandem Super Kong to install a total of 16 piles with diameters varying between 2 meters and 3,2 meters with weights up to 300 tons.

APE Model 600 Tandem for Seaway Heavy Lifting

Soil displacement piles (cast in situ), in Holland so called VGS grout injection piles, are being installed for storage tanks.

Hillcon HSCX900-GLS breaks all records!

CAPE Holland Group is contracted for the installation of 16 piles for the Helwin Alpha and Borwin Beta project. A tandem APE 600 is going to install piles with a total length of 96 meters.

Offshore Helwin Alpha & Borwin Beta

Monday morning 3 September 2012, around 4 am, the last windmill foundation pile for the Riffgat windmill park was installed.

Riffgat; Great success

CAPE Holland Group writes history by installing 60” piles with a total weight of 280 ton 60 meter underwater.

APE 600 Underwater Egypt Tuna field

CAPE HOLLAND
APE HOLLAND
HILLCON
OFFSHORE