Home / News / APE Model 200 working under water in Greece

APE Model 200 working under water in Greece

An APE Model 200 was delivered to a customer in Greece, for driving wick drain  under water at Thessaloniki. The drain of 15 meter length has to be driven up to 10 meters under water. The APE Model 200 performed very well, without adaptations made to the machine.

In front of the airport a piece of land has to be reclaimed for the extension of the runway. The project completion is scheduled by 2012.

Click on the below thumbnails to go to the picture gallery.

Land reclamation APE Model 200 driving under water



Disclaimer | VisualMedia