Home / News / APE D62 diesel hammer to Turkmenistan

APE D62 diesel hammer to Turkmenistan

APE Holland is sending an APE D62 diesel hammer to an offshore project in the Caspian Sea, where piles of 1067 mm will be driven. The piles are part of the construction of Block 2 Riser Platform at Djeytun (LAM) Oil Field offshore Turkmenistan. 

An operator and a mechanic of APE Holland acompanied the set, and operated the diesel hammer on site. Even in the extreme hot conditions (± 50° C outside temperature), the APE Diesel hammer proved himselve. 

See more pictures here >>>

APE D62 at APE Holland workshop APE D62 with lifting slings attached




Disclaimer | VisualMedia